SUMMARY OF COMPLETED CIVIL CONSTRUCTION PROJECTS

S/No. Description of Project Client & Location Value of Project
1. Civil Construction of 150 Villas KEMEEYA HOUSING – Jubail SABIC SR / 9.80 M
2. Execution of SPC Buildings SAMSUNG/Saudi Petrochemical -Jbl. SR / 3.68 M
3. Renovation of IBNESINA Buildings IBNESINA – Jubail SABIC SR / 0.65 M
4. Supply & Installation of temporary fencing work with foundations. UNILUBE – Jubail Industries SR / 0.20 M
5. Construction of Sceco Transformer Foundations & Execution of Cable laying. NIGC GAS-Jubail SABIC SR / 0.38 M
6. Renovation of Admin Building, Walkways, Smoking Shelter. NIGC GAS-Jubail SABIC SR /1.35 M
7. Civil Works for 7 nos. R.C. Schools ROYAL COMMISSION – Jubail SR / 4.95 M
8. Construction of Villas under khonaini Royal Commission Jubail SR / 3.45 M
9. Construction of Production Hall M. K. CABLE – R. C. Jubail SR / 1.15 M
10. Fabr’n/Construction of Ware House SAUDI EGGA – R. C. Jubail SR / 1.45 M
11. Construction of concrete plateform for heavy machines / equipments. SAUDI EGGA – Jubail SR / 3.45 M
12. Civil & Mechanical work installation of pre cast/kurb stones, flood lights. SAUDI WILLICH – R. C. Jubail SR / 2.34 M
13. Pre cast pump house Installation METE – R. C. Jubail SR / 1.23 M
14. Provision of two portable units at PK during VCM shutdown WBS EST – R. C. Jubail SR / 0.24 M
15. Construction of Maintenance Facilities SAUDI WILLICH – Jubail SR / 0.35 M
16. Construction of Walkway SAUDI VOIST ALPINE – Jubail SR / 0.23 M
17. Construction of Sceco Substation SCECO-Qateef SR / 3.93 M
18. Industrial Material Supply NAVEL BASE-Jubail SR / 1.50 M
19. Deisel Generator Power Supply Cabling and hookup system FMC – Khubar SR / 1.13 M
20. Repairing of Loading Plateform 1 & 2 SODA-Jubail SR / 0.23 M
21. Construction of SWCC Housing Villas AZIZYA – Khobar SR / 4.56 M
22. Execution of EPCCO Housing MEP EPCCO-Khursaniay SR / 1.21 M
23. Installation of Ceramic Tiles-Renovation TAMIMI TAFGA-Jubail SR / 0.34 M
24. Fabrication & Erection of pipe lines. TAMIMI Construction – Dammam II SR / 0.91 M
25. Renovation of Saudi Tourist & Travel Bureau Building SAUDI AIR LINE-Jubail SR / 2.34 M
26. Renovation of Office and Warehouse / Store Buildings Abdullah Hashim Industrial Gases & Equipment Co. Ltd.-Jubail SR / 2.43 M
27. Drainage line from HRSG to drain pit at PP-9 project Riyadh DEKOMTE / RAYTHEON – Riyadh SR / 4.32 M

EXECUTED PROJECTS IN SAUDI ARAB

S/No. Description of Project Client & Location Year Value of Project
1. Fabrication of Cooling Tower and Reminerlization Plant ‘s Steel Structure WorksSilos, 3 Sedimentation and 3 Used backwash tanks, sludge handling system and their pumping station along with FRP pipelines installations with Pipe Supports. Moh’d Abdulmohsin Kharafi Sons Co. Riyadh – KSA 74.6 MIGD Jubail Product Water Expansion Project, SWCC – Jubail. 2003 to 2004 (partially) 2.500million
2. Construction of Private Buildings complete with finnshing stones installation for 15,00 sm² areas Mohd. Hussain Al-Orainey Est.  – Khobar 2003 To 2005 1.750 million
3. Design, Fabrication and site erection of steel structural sheds, tanks, vessels, foundations for their equipments and  maintenance projects. United Lube Oil Company (Pvt.) Ltd. – Ind. City Jubail Saudi Arabia. (frequently awarded) 2003 To 2005 (partially) 0.542 million
4. Fabrication & Erection of piping & equipments with saddle supports at site. TAYF -INDUSTRIAL CITY JUBAIL. Registered as sub contractors 2005 To 2005 0.250 million
5. Fabrication and Installation of high pressure Fire Fighting pipe lines about 6200 dia inch. DLPS – Abqaiq / Jubail, Client for SWCC – Jubail 2005 To 2005 1.550 million
6. Fabrication of Grating, Hand rails, ladder and cages of Equipments and chemical storage tanks. Gulf Steel Works – Jubail 2005 To 2005 1.500million
7. Fabrication and Installation of Exhaust Fume System including duct work w/ supports. TAYF – INDUSTRIAL CITY JUBAIL 2006 To 2006 0.155 million
8. Fabrication of S.S. Vessels about 50 ton for Instrumentation Air sytem. United Lube Oil Company (Pvt.) Ltd. – Ind. City Jubail Saudi Arabia. 2006 To 2007 0.750 million
9. Fabrication and Erection of 2” dia. C.S. pipe lines for asphalting on pipe rack permanent and temporary tie-in connection in emergency shutdown About 1500 dia. Inch
10. Fabrication of high pressure vessel 120 ton for Sulfer converter for khursaniyah INMA Steel Industry – Jubail through Zain Steel Industry. 2006 To 2007 1.253 million
12. Civil Work for concrete structure and block w/ painting. AZMEEL Contr. & Const. Co. – Jubail 2006 – 2006 0.255 Million
13. Fabrication of Platforms, Steel Structure Buildings and Pipe Racks with supporting beams & accessories 190 Ton AK Group – Jubail for Qatar Project 2005 To 2006 1.565 million
14. Fabrication, Blasting and painting of Steel structural posts having 2000 ton load capacity.depending on EA 25 ton appx. ART Industrial Supports Services – Jubail for HADEED 2006 To 2006 1.450 million
15. Pipe and Saddle Supports 75 Ton for Desalination Plant – Mitsubish and Safco Shut Down Projec ts Al- Gaswa Supports Pvt. Ltd.(GSCO – Jubail) for Mitsubishi Projects. 2007 To 2007 1.100million
17. Fabrication and Erection of 15mm upto 125mm dia. S.S. & C.S. pipe lines for steel forging machinery tie-in connection in production area about 2500 dia. Inch. Kalma Cont. Est. – Jubail for United Gulf Steel Industry Pvt. Ltd. 2007 To 2007 0.453 million
18. Construction of Private Buildings complete with finnshing for 25,00 sm² areas. Al Mubaraz Cont. Co. – Al Ahsa Near Rashid Mall 2006 To 2007 0.653 Million
19. Supply & Fabrication of Steel Structural Building and S. S. and C. S. Piping about 5500 Dia Inch for Hassad / JANA Project Technical Sources for JANA Epoxy Plant – Jubail 2007 To  continue 1.467 million
20 Civil Work for Suwaidi Camp 1 fnshing (Tile & Plastering  Work) and Internal/External painting. Al-Zahrani Trad. & Cont. Co. – Dammam 2007 to 2007 0.350 million
21 Supply & Fabrication of Steel Structures & Embedments/ Templates & Base Plates for Huyndai – Marafiq Project Al- Gaswa Supports Pvt. Ltd.(GSCO – Jubail) for Mitsubishi Projects. 2007 To 2008 0.860 Million
22 Fabrication & Installation of Thermowall C.S. & S.S. Pipe Line about 3000 Dia Inch. Gulf packaging Industries Ltd. Co. Jubail Ind. City 2007 To 2007 0.825 Million
23 Supply & Fabrication of S.S. Ducts for Bruckner Machine ‘s Fume Exhausting System Gulf packaging Industries Ltd. Co. Jubail Ind. City 2007 To 2007 0.425 Million
24 Supply & Fabrication of Stainless Steel 316L & C.S. Embedments, Templates, Structural Supports & Embedment Items for R.C. Industrial Facilities Projects. AL-HARBI Trading & Contracting Company Riyadh – Jubail R.C. Projects. 2007 To 2008 1.500 Million
25 Supply and Fabrication of Marafiq Tanks PlatForms, Structure, Handrails, Ladders and Site Facilities Steel Goods. DONG SUNG Saudia Al-Khobar – Jubail Hyundai – Marafiq Project 2007 To 2008 1.900 Million
26 Fabrication of Equipments Platforms, Structure, Handrails & Ladders etc… SAUDI PAN GULF Jubail – SABIC 2007 To 2008 0.800 Million
27 Fabrication of Aramco/Sabic Equipments Platform, Handrails, Ladders & Accessories MISA – Marinetime Industrial Services Arabia Co. Ltd.-Jubail 4/2008 – 5/2008 38,500 SAR
28 Supply & Fabrication of SS-316L Drip Trays for Battery Equipment Saudi Binladin Group – Sharq 3rd Project 4/2008 – 5/2008 24,960 SAR
29 66” Dia Mitered Elbow with 3 M Pipe in Gr. 70, 100% NDT Fluor Canada Ltd. – Sipchem Jac Project 4/2008 – 5/2008 94,800 SAR
30 Supply, Fabrication & Installation of Platform for Maintenence Work 5 Units upto 48 Floors Al-Suwaiket Trand. & Cont. Co. – Khobar at DEHRAN TOWER 5/2008 To continue 333,450 SAR
31 Supply, Fabrication & Installation of Steel Supports for ELEVATOR upto 48 Floors Al-Suwaiket Trand. & Cont. Co. – Khobar at DEHRAN TOWER 5/2008 – 6/2008 75,600 SAR
32 Supply, Fabrication & Installation of 2 nos. Emergency Stair case Haindrails upto 48 Floors Al-Suwaiket Trand. & Cont. Co. – Khobar at DEHRAN TOWER 5/2008 – 7/2008 208,000 SAR
33 Supply, Fabrication & Installation of Emergency Platform, Stair case Haindrails upto 4 Floors Al-Suwaiket Trand. & Cont. Co. – Khobar at Euro Village Office Building # 01 – KENT 7/2008 – 8/2008 37,263 SAR
34 Supply, Fabrication & Installation of Platform for Maintenence Work 01 Unit upto 48 Floors Al-Suwaiket Trand. & Cont. Co. – Khobar at DEHRAN TOWER 11/2008 To continue 94,770 SAR
35 Design, Fabrication, Painting (Chemical Resistance) & Supply of CS Tank for SNF Storage 80m³, API 650, Ø4.5 X 5.2 M Ht. SFCCL-CHEMANOL Methanol Chemicals Company – Jubail 6/2008 – 7/2008 97,000 SAR
36 Repair of AIR PLENUM Equipment C.S. 4 M x8 M x 4 M Fluor Canada Ltd. – Sipchem Jac Project 6/2008 – 6/2008 22,000 SAR
37 Design, Supply, Fabrication & Erection of Roof Deck Framing Shed for Multi Purpose Hall Construction Project. 800 m² Abdul Rahman Hejazi Cont. Est. through main contractor  Al-NABA / Hadeed 4/2008 – 8/2008 184,500 SAR
38 66” Dia Pipe x .375 mm Wall Thk. in Gr. 70, 100% NDT Fluor Canada Ltd. – Sipchem Jac Project 6/2008 – 6/2008 21,500 SAR
39 Fabrication, Paint of CS – Gr. 70 & SS-316L VENT STACKS without material – 3 Nos. 48” Dia ~ 24” Dia x 61 Mtr. Ht. Fluor Canada Ltd. – Sipchem Jac Project 7/2008 – 10/2008 824,900 SAR
40 Hydro Testing of Vent Stacks @ 3.5 Bar but tested actually 6 bar Fluor Canada Ltd. – Sipchem Jac Project 7/2008 – 10/2008 190,100 SAR
41 Fabrication of 20” Dia Pipe x .375 Wall Thk, SS-316L without material on NDT 100% Fluor Canada Ltd. – Sipchem Jac Project 7/2008 – 11/2008 216,000 SAR
42 Supply & Fabrication of Vortex Reducers – 3 nos. 1220x600x5 mm T. SFCCL-CHEMANOL Methanol Chemicals Company – Jubail 9/2008 – 9/2008 4,600 SAR
43 Supply, Fabrication, Painting & Erection of Steel Structure Shed 700m² for Private Saudi Owner in Light Industrial Area – Jubail Mulaq Abdul Rahman Al-Otaibi – Saudi Work Shop Owner 9/2008 – 12/2008 128,000  SAR
44 Supply, Fabrication, Painting & Installation of Fire Fighting Water Service Piping for Office/ Factory Energy Engineering Services – VESSEL HEAD Factory Jubail 11/2008 – to continue 105,000 SAR
45 Supply, Fabrication, Painting & Installation of LPG GAS Piping for Furnace Supply. Energy Engineering Services – VESSEL HEAD Factory Jubail 12/2008 – 12/2008 6,130 SAR
46 Supply, Fabrication, Painting & Installation of Fire Fighting Water Service Pump Pit Headers Energy Engineering Services – VESSEL HEAD Factory Jubail 11/2008 – to continue 25,000 SAR
47 Supply, Fabrication & Installation of Platform for Maintenence Work 02 Unit upto 48 Floors Al-Suwaiket Trand. & Cont. Co. – Khobar at DEHRAN TOWER 01/2009 To 01/2009 58,050 SAR
48 Supply, Fabrication & Installation of Emergency Platform, Stair case Haindrails upto 4 Floors Al-Suwaiket Trand. & Cont. Co. – Khobar at Euro Village Office Building # 02 – KENT 1/2009 – 1/2009 37,100 SAR
49 Fabrication & Installation of LPG Piping & Equipments for Saudi paper Mills Dammam II Ind. City Industrial Energy Services for LPG Systems – Dammam 2/2009 – 2/2009 83,285 SAR
50 Design, Fabrication, Picklin  & Supply of SS-316L Scrub Water Tank 11.42m³, API 650, Ø2.5 X 3.2 M Ht.x6 mm thk. SFCCL-CHEMANOL Methanol Chemicals Company – Jubail 3/2009 – 4/2009 106,000 SAR
51 Supply and Fabrication of Standard Galvanized Grating 32x5x30x100mm base on the layout drawings for trench covers M. S. Al-Suwaidi Industrial Services Co. Ltd. For Saudi Kayan Project 3/2009 – 4/2009 46,125 SAR
52 Supply and Fabrication of Non Standard Galvanized Grating 50x6x30x100mm – 370x1000mm for Lt. Vehicle Trafic Road Covers M. S. Al-Suwaidi Industrial Services Co. Ltd. For Saudi Kayan Project 4/2009 To continue 247,000 SAR
53 Design, Supply, Fabrication, Painting and Installation of Building Stair Handrails & Cage Ladders as per SABIC strd’s M. S. Al-Suwaidi Industrial Services Co. Ltd. For Saudi Kayan Project 4/2009 To continue 89,840 SAR
54 Design, Supply, Fabrication, HHR Paiting & Installation of Fume Heater Chimner 32″x20M Lg. United Lube Oil Co. Ltd. – UNILUBE for Blending Plant PRJ. 4/2009 -5/2009 108,000 SAR
55 Fabrication of Platforms, Cage Ladders & Accessories for Vessel Equipments @ Client Shop. Gulf Heavy Industries Co. – GHI – II for Saudi kayan Project 5/2009 – 5/2009 15,000 SAR
56 Fabrication of Grating Thread 65x5x30x100mm -760 mm Lg. x244 mm – 48 pcs. As per the drawings for ARAMCO Strd. M. S. Al-Suwaidi Industrial Services Co. Ltd. For Riyad Refinery Project 7/2009 8/2009 20,400 SAR
57 Design, Supply, Fabrication & Installation of ALUMINUM Cage & Ladders for Maintenence Work 05 Units upto 48 Floors Al-Suwaiket Trand. & Cont. Co. – Khobar at DEHRAN TOWER 3/2009 12/2009 367,030 SAR
58 Design, Supply, Fabrication & Installation of Fire Fighting System Pump House Maint. Access OverHead Crane 5 ton w/ Utilities.. Al-Suwaiket Trand. & Cont. Co. – Khobar at DEHRAN TOWER 8/2011 11/2011 225,000 SAR
59 Design, Supply, Fabrication & Installation of CHILLER Maintenance Sked Frame upto 5 ton capacity @45th Floor with limited access. Al-Suwaiket Trand. & Cont. Co. – Khobar at DEHRAN TOWER 12/2012 12/2012 127,000 SAR

SUMMARY OF SUCCEFULLY ACCOMPLISHED JOBS / ORDERS IN GCC & BAHRAIN

S/No. Description of Project Client & Location Year Value of Project
01 Supply of Carbon Steel & Stainless Pipes & Fittings regular contract. Gulf Temperature Sensors W.L.L.-Bahrain 2010- Present 160,000+ BHD
02 Supply of  Hattersley Valves & Fittings Electrical – Mechanical Company (EMCO) Dec. 2011 70,000    BHD
03 Supply of Electro Mechnical Material, Pipe,  Fittings & Accessories etc… Technip France Abu Dabhi(U.A.E) for BAPCO Project 2011-Present 190,000  BHD
04 Supply of Compression Tubes, Fittings & Accessories etc… Exterran for Tatweer Petroleum 2012 Present 125,000  BHD
05 Ramsis Engineering Ltd. – Fasteners Technip Bahrain  for BAPCO Project 2012 Present 19,000 BHD
06 Supply of Pipe Fittings & Accessories Delta Indusrtial Supplies CO. W.L.L 2012 Present 25,000 BHD
07 Supply of SMLS Pipes, Fittings & Accessories Wallia Super Coil Tech W.L.L 2012 Present 43,000 BHD
08 Supply of Instrumentation Fittings & Compression Sandvik Tubes / Fitt’s. MCSC – Tatweer Project 2012 Present 57,000 BHD